- AVAILABLE FOR PURCHASE:
- YES
- STYLE:
- CONTEMPORARY
- OPTION:
- DRY RATED
- BULB DIMMABLE:
- FALSE
- INTRODUCTION DATE:
- 01/01/2005
- SHIP CARTON HEIGHT:
- 6.00''
- SHIP WEIGHT:
- 3
- SPECIAL FEATURES:
- FROM THE BRAND FORMERLY KNOWN AS TECH LIGHTING
- VENDOR SHIP METHOD:
- UPS FEDEX
- WARRANTY:
- 1 YEAR
- WEIGHT:
- 1.10
- 24 VOLT:
- FALSE
- ADJUSTABLE HEAD:
- FALSE
- CABLE FIELD CUTTABLE:
- TRUE
- CANNOT SHIP TO CALIFORNIA:
- FALSE
- CANNOT SHIP TO CANADA:
- FALSE
- DAMP RATED:
- FALSE
- DARK SKY:
- FALSE
- DRY RATED:
- FALSE
- FWC COMPLIANT:
- FALSE
- INTEGRATED LED:
- FALSE
- ITEM COLOR 1:
- BROWN
- MASTER COLOR:
- BROWN
- MOTION SENSOR INCLUDED:
- FALSE
- PHOTOCELL INCLUDED:
- FALSE
- REPLACEABLE LAMP:
- FALSE
- REVERSIBLE:
- FALSE
- SAFETY RATING:
- ETL
- SHAPE:
- PRE-BENT S-CURVE
- SLOPED CEILING COMPATIBLE:
- FALSE
- SOLAR POWERED:
- FALSE
- SORAA:
- FALSE
- STOCKING TYPE:
- MADE TO ORDER
- SYSTEM:
- MONORAIL
- TITLE 20:
- FALSE
- TITLE 24:
- FALSE
- TRANSFORMER REQUIRED:
- FALSE
- WARM COLOR DIMMING:
- FALSE
- WET IP65:
- FALSE
- WET RATED:
- FALSE
- CEILING:
- YES
- QUANTITY AVAILABLE AT MANUFACTURER:
- UNKNOWN
- LOCAL_ON_DISPLAY:
- 0
- ON DISPLAY IN SHOWROOM:
- No
- LOCAL_COUNT_ON_DISPLAY:
- 0
- LOCAL_SALE:
- 0
- LOCAL_COUNT_SALE:
- 0
- LOCAL_IN_STOCK:
- 0
- IN STOCK IN SHOWROOM:
- No
- LOCAL_COUNT-IN_STOCK:
- 0
- LOCAL_CLEARANCE:
- 0
- LOCAL_COUNT_CLEARANCE:
- 0
- HEIGHT:
- 0.60
- HEIGHT RANGE:
- 0-15''
- WIDTH:
- 0.30
- WIDTH RANGE:
- 0-15''
- FINISH:
- BRONZE
- STANDARD STYLE:
- CONTEMPORARY